Municipal Water Pumps Solution for Rapid Flood Control and Drainage
Industrial Circulating Water Pump Solution in the Philippines in 2025
January 15, 2026
2025 Flood Pump Solution in Azerbaijan
January 15, 2026

Municipal Water Pump Case in Malaysia, 2025

Project View

Faced with frequent flooding, the Malaysian government required 4 sets of municipal water pumps powered by diesel engines for a key drainage project in October 2025.

The pumps needed to efficiently handle a challenging mix of stormwater, river water, and sewage at a specified duty point of 504 m³/h @ 20m with self priming function.


Challenge:

1-Enabling fast startup and deployment in urgent scenarios

2-Ensuring unwavering reliability when pumping abrasive or solid-laden liquids over extended operation, requiring continuous duty water pumps.

 

Our Solution:

  • High-Capacity JT Series Self-Priming Pump: Ensured self priming function and consistent performance under variable flood conditions for quick response.
  • Clog-Resistant Semi-Open Impeller: Designed to pass solids up to 76mm, providing superior abrasion resistance for sewage and debris-laden water.
  • Intelligent Control System: Enabled 24/7 continuous, unmanned operation with remote monitoring capabilities and automatic self-protection functions.
  • Global Power Standard – Cummins Diesel Engine: Guaranteed consistent performance and simplified long-term maintenance for the diesel powered water pumps, backed by worldwide parts and service support.
  • Rapid-Response Skid Design: Facilitated immediate installation and easy mobility between sites to meet urgent flood control needs.

 

Value & Results:

Enhanced Public Safety & Asset Protection: The municipal water pump set achieved rapid dewatering, significantly reducing flood-related road closures, property damage, and community disruption.

Optimized Total Cost of Ownership: The combination of durable design, large capacity water pumps, and accessible global technical support minimized lifecycle maintenance costs and operational downtime for the client.

20%

Efficiency Improvement

15%

Energy Saving

Municipal Water Pump Case in Malaysia, 2025

JT JU Sellf Priming Sewage Pump

Tell Us What You Need

    Get A Quote