Project Overview:
In June 2022, we successfully delivered and commissioned two complete diesel-powered dewatering systems within two weeks for an open-pit mining operation in Laos facing urgent drainage challenges during monsoon season.
Challenge:
An open-pit mine required rapid dewatering during heavy rainfall, needing a high-capacity pump solution capable of handling:
- Pump capacity: 800 m³/hat 150m
- Operate reliably in harsh mining environments
- Low fuel consumption
- Pump frame to towing and pushing
- Minimize downtime to avoid costly production delays.
Our Solution:
- Heavy-Duty Pump System:
- Specially engineered split-case centrifugal pumps
- Designed for high-volume mine dewatering applications
- Specially designed pump frame for more easily moving
- Optimized Power System:
- Weichai industrial diesel engines (fuel-efficient operation)
- Rugged construction for 24/7 performance
- Smart control panel with:
Automatic start/stop functionality
Remote monitoring capabilities
Fail-safe protection systems
Performance Results:
- Achieved complete site dewatering in just 12 hours
- Prevented estimated $2 million in potential production losses
- Demonstrated 100% system reliability during critical operation
- Provided mine operators with efficient, low-maintenance solution
30%
Improved efficiency
15%
Energy saving