Ghana Mine Dewatering Solution in 2022 | DEFU
TPOW Split Case Double Suction Pump served in Laos
Emergency Mine Dewatering Case in Laos in 2022
June 7, 2025
Flood Drainage Pumps for Peru Bidding Project in 2023
June 9, 2025

Ghana Mine Dewatering Solution in 2022

Project Overview:

In 2022, a repeat customer in Ghana needed a high-performance mine drainage system capable of:

  • Flow rate: 1,000 m³/h
  • Head: 200m
  • Self-priming functionality for near-clear water applications

The system had to provide rapid dewatering to prevent operational downtime during heavy rainfall.

 

Challenges:

✔High-flow, high-head pumping in demanding mining conditions

✔ Quick-start self-priming for emergency response

✔ Reliable 24/7 operation in harsh, wet environments

✔ Reducing long-term maintenance and operational costs

 

Our Solution:

We engineered a robust, skid-mounted pumping system with the following key components:

  • High-Efficiency Double-Suction Pump – Delivers superior drainage performance, even during extreme weather.
  • Cummins Diesel Engine – High-power, globally trusted for reliability and easy servicing.
  • Vacuum Priming System – Ensures instant self-priming for quick deployment.
  • Heavy-Duty Weatherproof Canopy – Shields equipment from rain and debris, minimizing wear.
  • Automated Control Panel – Enables 24/7 unmanned operation with built-in safety protections.
  • Modular Skid Base – Allows for easy transport, installation, and repositioning.

 

Results:

✔ Emergency dewatering completed in 72 hours – Prevented significant financial losses from mine shutdowns.

✔ Reduced maintenance costs – Durable construction and premium components ensured long-term reliability.

 

 

20%

Efficiency Improvement

15%

Energy saving

Ghana Mine Dewatering Solution in 2022

TPOW Split Case Double Suction Pump

Tell Us What You Need

    Get A Quote